Pages

Friday, September 26, 2014

Albion Avenue Reconstruction

Concrete paving began this morning at 7am. The sub-contractor for paving is Doyle Conner which is based in Rochester. Here is a look down the street at the grade with all of the dowel baskets set in place for each transverse joint. The second picture shows how the concrete is placed on grade ahead of the paving machine. Lastly, is a photo of first concrete placed this morning. The contractor will be paving approximately 850 cubic yards today.

Thursday, September 25, 2014

Albion Avenue Reconstruction

Expect delays as paving of Albion Avenue between Lair Raid and Oak Beach Drive is scheduled for Friday, September 26th. Paving operations will be restricting traffic flow for most of the day and into the evening hours. These operations will cause significant delays so the public is encouraged to find an alternate route this day. Southbound traffic will still be able to access residences and businesses, but delays are anticipated, so please plan ahead. The southbound only traffic and business access will resume on Monday with the same restrictions as the past several weeks. Below is a picture of the northbound lane that will be paved on Friday.