Friday, August 31, 2012
Winnebago Avenue Sports Complex
The bases were installed this week on the fields and bollards were installed at all trail entrances. Doors have been installed on the concession stand with the outside concrete apron being poured this week. The contractor was installing the ceiling in all the rooms and all of the plumbing is ready for new fixtures.
Water Treatment Plant
A lot of progress has been made since the last post. Several hundred more yards of concrete have been placed in the filters and recarbonation basins. All of the flooring in the garage was placed along with the diesel tank for the new generator. This week the precast walls of the north half of the building were erected. The high service pumps and much more process piping was installed and precast hollow core flooring was set for a portion of the operations level.
Lair Road Bridge
The bids were opened for the construction of the new bridge. Minnowa Construction from Harmony, MN was awarded the project with a cost of $2.3 million. Construction is scheduled to begin in September beginning with the demolition of the existing house.
Subscribe to:
Posts (Atom)